Community Recreation Complex Project
Rec Complex banner Feb 1 2017

Learn More graphicPUBLIC OPEN HOUSE FEB 27
2-7:30 pm at Wilson Centre
Learn more about the project and the proposed adjacent residential and mixed-use development, and tell us what programs you'd like to see in the new complex.
WILSON CENTRE COFFEE CHAT: FEB 20
10 am-noon at Wilson Centre

Wilson Centre users are invited to come for coffee and talk to staff about plans for seniors' programs.
 Rec Complex drawing - north plaza

Over the next four years, we’ll be replacing the aging recreation facilities and library in our downtown with a vibrant community hub.

Fencing will be up by late February 2017 and ground-breaking starts in March for the 205,000-square-foot Community Recreation Complex south of Wilson Avenue, between Mary Hill Road and Kingsway Avenue.

The complex will be a place where people will gather, meet for coffee, watch or participate in activities, and access a variety of services. Amenities will include a leisure pool, three ice sheets, library, multi-use spaces, games room and lounge, café, gym, fitness centre, outdoor plaza and more. 

A phased approach to construction will help to limit the impact on users by enabling existing recreation and library facilities to stay open until they are replaced. New amenities will start opening in 2019, with project completion in 2021.

A proposed adjacent private development is to include a mix of apartment buildings, seniors’ and rental housing, and a restaurant or café.

PROJECT INFORMATION
                 
CONSTRUCTION IMPACTS               CONSTRUCTION TIMING 
                 
FINANCING AND TAX IMPACT               PARKING
                 
STAYING INFORMED               PROJECT PARTNERS

New Entrances as of February 27, 2017

Rec Complex site map Feb 16 2017

Click image for larger map

Construction fencing will be installed by February 27, 2017. During the construction, access to the existing recreation complex will be moved to two new fully accessible entrances on the west and east sides of the building.

More about construction impacts.

Project Information

CRC plaza street view

 CRC ground floor plan
Click the floor plan images for larger versions
 CRC upper floor plan

The 205,000-square-foot complex will replace the outdated Port Coquitlam Recreation Complex, Wilson Centre and Terry Fox Library with a vibrant community hub providing a range of recreational amenities, a library and public spaces.

Project completion is anticipated in summer 2021. The innovative approach to construction involves several phases to reduce service disruption for users. Some elements – including the leisure pool, fitness centre, gym and library – will be ready for use as early as 2019. More on project timing.

Project highlights include three sheets of ice, an indoor leisure pool, new fitness facilities, a new library, a spacious outdoor plaza, and underground parking that maximizes the site’s buildable space. More on project amenities.

Preliminary Concepts Image

The vision for the new facility reflects the extensive input gathered from the community in 2014. Read the community engagement report.

The $132-million project cost will be offset by land sales revenue and federal funding. More on financing and tax impacts.

The project will be complemented by a proposed residential and mixed-use development, to be built by the project’s developer on the site of the former works yard off Kelly Avenue and residential lots off Mary Hill Road.

The private development proposal includes a mix of apartments, seniors' and rental housing, and and a restaurant or cafe. It will go through the City's normal development approval procedures. 

Amenities
Aquatic Facilities
The new pool will be similar in size to Hyde Creek Recreation Centre’s leisure pool and will focus on leisure and therapeutic activities.

It will feature a sloped entry and will be warmer and shallower than the facilities at Hyde Creek and Centennial Outdoor Pool, both of which will continue to accommodate competitive and fitness-focused swimmers.

To retain the City’s competitive swimming capacity, the City has allocated funding to refurbish Centennial Pool in 2017 for both competitive and leisure use, including the washroom and changing areas.
Ice Facilities

The three ice sheets will include:

The multi-purpose rink will incorporate an accessible design that allows for standard ice uses (e.g. hockey, ringette and sledge hockey), but it will also have removable boards and other design features to allow for leisure ice, figure skating, or other specific programming that uses a non-standard ice configuration.

Construction Timing

Construction will take place in stages between March 2017 and summer 2021.

Construction fencing will be installed by the end of February 2017 on the north side of the site, and the ground-breaking will take place in mid-March (date TBA).

Port Coquitlam Recreation Complex and Terry Fox Library will remain open until they are replaced. Due to the phased construction approach, new areas will be constructed while existing components are still in use.

This will ensure that services and programming currently offered on the site will continue to be available throughout the construction process. New amenities will start opening up in 2019.

Rec Complex timeline Feb 1 2017

Construction of the residential and mixed-use development is proposed to take place during the same time frame as the City's project.

Construction Impacts

Safety will be the top priority throughout the project. Public access will be limited to safe areas, but visitors can expect construction noise and vibration at times.

We will do our best to limit the impacts, and appreciate your patience.


City staff will work closely with users and rental groups to reduce the impact on programs as much as possible. In some cases, programs will be temporarily relocated to other sites or spaces, with ample notice provided to participants.

The City has committed to keeping the public and users updated on the project’s progress and construction impacts through information bulletins, website updates and other means. Find out how to stay informed.

A stakeholder group has also been formed to provide feedback and engage with the community during the construction process.

There will be some tree removal on the site as part of the construction preparation. Learn about plans for trees on the site.

Parking

The first phase of construction will eliminate all parking on the north side of the building and much of the west-side parking.

As of March 1, 2017, free parking will no longer be available to West Coast Express commuters, and all on-site parking will be limited to three hours.

To ensure parking is available for facility users and customers of local businesses, the city will actively enforce the posted parking limits at the complex and nearby streets, and issue tickets of up to $40 when necessary.

Commuters are encouraged to:

There is also some limited parking available within walking distance in the area or at Gates Park.

Financing and Tax Impact

The impact on taxpayers is being phased in over several years. Taxpayers will pay a $25 parcel tax per property from 2017 to 2020, and property taxes will increase 0.5 per cent in 2017, one per cent in 2018 and one per cent in 2019 to pay for this project. This is in addition to tax increases of 1.28 per cent in 2015 and 0.5 per cent in 2016 that were directed towards the project.   

For the average homeowner, the combined levy and tax increases related to the new complex will equate to approximately $110 more in property taxes each year until 2020, and $85 per year afterwards (actual dollar amount will vary based on property value).

The funds collected will initially help pay for the construction of the complex, and will then be used for a loan repayment and ongoing operational and maintenance costs. 

Funding Sources

Project Partners

Following a competitive process, the City selected Ventana Construction, a Burnaby-based general contractor and construction manager, to plan, design and construct the project. 

Ventana, which built the Langley Events Centre and Prospera Centre in Chilliwack, focuses on building multi-unit residential, commercial, light industrial and public recreational facilities, primarily in Metro Vancouver.

Ventana has partnered with Quantum Properties for the residential and commercial components and Architecture 49 for the design.

Quantum Properties is an Abbotsford-based real estate development and construction company that has built a number of condo and commercial-retail projects in Metro Vancouver and the Fraser Valley. Architecture 49 is one of the largest architectural firms in Canada and has designed numerous recreational centres.

The residential and mixed-use components will offer various ownership and occupancy options. Development of these components will proceed through the City’s regular approval process and dovetail with the Community Recreation Complex construction.

Staying Informed

More Information

Email reccomplex@portcoquitlam.ca
Project information: 604.927.5420
Program information: 604.927.7529