Cedar Drainage Pump Station

The City is upgrading drainage to protect neighbourhoods in north Port Coquitlam, including Cedar Creek Pump Station.

  • Status: Tendering
  • Construction: Summer 2026 to Summer 2027
  • Funding: 2026 Capital Plan
  • Locations: Cedar Drive near Chelsea Avenue

What is happening

Renewing a key part of the drainage network

The City of Port Coquitlam is upgrading the Cedar Creek Pump Station near the northeast end of the city. The pump station is located within the existing dike system at Cedar Drive, immediately upstream of the confluence with Hyde Creek. The pump station and flood box are designed to protect a large upstream community of homes, businesses, schools, and other developments from flooding by pumping water downstream during high water level conditions. Water from the station flows into Hyde Creek, then into DeBoville Slough and ultimately the Pitt River.

Proposed upgrades to the pump station will include replacing the existing submersible pump with two fish friendly axial-flow propeller pumps and related infrastructure, upgrades to the electrical system, install of a backup generator and seismic upgrades.

Why it matters

The existing pump station was build in the 1970s. The station does not currently have provisions for safe fish passage and requires upgrades to provide additional capacity for increased flows during significant rain events.

Project Status

This project has been awarded to Westport Construction Group Inc. There are several key factors that are being evaluated prior to work starting on-site, including long-lead equipment delivery schedules, environmental and permitting compliance, BC Hydro grid connection timing, and strategies to avoid unnecessary community disruptions prior to when necessary. We are working in the background to optimize timing of the work in order to carry out the work as efficiently as possible and with as little impact to the community as possible. 

Once we have more detailed information regarding start dates and coordination of the mentioned works, further updates will be provided. This project is anticipated to be completed by late Summer 2027.

Thank you for your patience as we look towards completing this work for the community.

Project Renderings

Image
Cedar Creek Drainage Rendering
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image

Funding

This project is funded in part by the Government of Canada. This project is a shared investment in the community. Investing in core infrastructure like this helps keep the community safe and resilient for years to come.

Image