Energy Permit

An Energy Permit is required for the installation of a hydronic heating system. An Energy Permit is not required for the repair of minor leaks in heating pipes and the replacement of pumps, zone valves, or other components of the heating systems.

Energy Permit Application [PDF/186KB]